Enhancements    

DEVELOPMENT OF A CONTINUOUS FOR LIVE LOAD PREFABRICATED STEEL ACCELERATED BRIDGE CONSTRUCTION (ABC) UNIT FOR TEXAS BRIDGES

DEVELOPMENT OF A CONTINUOUS FOR LIVE LOAD PREFABRICATED STEEL ACCELERATED BRIDGE CONSTRUCTION (ABC) UNIT FOR TEXAS BRIDGES
PI: Jeffrey Weidner
Sponsor: U.S. DEPARTMENT OF TRANSPORTATION THROUGH TEXAS DEPARTMENT OF TRANSPORTATION
Center for Transportation Infrastructure Systems (CTIS)
Amount awarded: $119,619

This project develops a system where prefabricated steel ABC units perform continuous for live load to accelerate bridge construction.

Posting date: Thu, 05/06/2021

Award start date: Wed, 09/01/2021
Award end date: Sat, 08/31/2024